Contractors thrive on ambiguity. We thrive on precision engineering. Below is a raw, transparent line-item estimate for executing our flagship "Extraction & R-49 Upgrade" on a standard 2,500 sq ft Texas footprint.

The Blueprint Estimate

(2,500 Sq Ft Single-Story)
  • Phase 1: Industrial Extraction Complete removal and hazmat disposal of old material.
    $3,750
  • Phase 2: Comprehensive Air Sealing Expanding foam applied to all can lights, top-plates, and wire penetrations.
    $600
  • Phase 3: Baffle Construction Cardboard venting chutes installed to protect soffit airflow.
    $350
  • Phase 4: R-49 Blown-In Fiberglass 18 inches of premium, formaldehyde-free white fiber.
    $3,500
Total Estimated Investment
$8,200