Contractors thrive on ambiguity. We thrive on precision engineering. Below is a raw, transparent line-item estimate for executing our flagship "Extraction & R-49 Upgrade" on a standard 2,500 sq ft Texas footprint.
The Blueprint Estimate
(2,500 Sq Ft Single-Story)-
Phase 1: Industrial Extraction Complete removal and hazmat disposal of old material.$3,750
-
Phase 2: Comprehensive Air Sealing Expanding foam applied to all can lights, top-plates, and wire penetrations.$600
-
Phase 3: Baffle Construction Cardboard venting chutes installed to protect soffit airflow.$350
-
Phase 4: R-49 Blown-In Fiberglass 18 inches of premium, formaldehyde-free white fiber.$3,500
Total Estimated Investment
$8,200